Mechanical Contractor for Power Generation Facilities

Critical Piping, Welding & Mechanical Support for Power Infrastructure

Industrial Welding Services provides mechanical contracting, pressure piping, specialty welding, equipment installation, fabrication, maintenance, and outage support for power generation and central utility facilities throughout the Mid-Atlantic.

Our crews support critical plant systems where pressure, temperature, weld quality, system reliability, and controlled outage execution demand experienced mechanical personnel.

  • Steam and condensate piping
  • Boiler and pressure piping
  • Natural gas and fuel oil systems
  • Critical code welding
  • Mechanical equipment installation
  • Planned outage support

Serving Maryland • Washington, D.C. • Virginia • Pennsylvania

Process Piping

Power Generation Capabilities

Steam & Condensate

  • Steam distribution
  • Condensate return
  • Equipment connections
  • System modifications

Boiler Piping

  • Boiler connections
  • Headers
  • Auxiliary piping
  • System modifications

Fuel Systems

  • Natural gas piping
  • Fuel oil piping
  • Supply and return
  • Equipment connections

Mechanical Equipment

  • Pumps
  • Heat exchangers
  • Packaged equipment
  • Mechanical skids

Critical Welding

  • Pressure piping
  • Qualified procedures
  • NDE / NDT
  • Specialty welding

Outage Support

  • Critical tie-ins
  • Piping replacement
  • Equipment modifications
  • Concentrated maintenance
Process Piping in Facility

Built for Critical Plant Systems

Power generation facilities contain interconnected mechanical systems operating under demanding pressure, temperature, and service conditions. Work on these systems requires careful planning, qualified personnel, controlled welding, and coordination around plant operations.

  • High-pressure piping systems
  • High-temperature service
  • Critical steam systems
  • Fuel gas and fuel oil
  • Operating plant environments
  • Limited outage windows
  • Code and inspection requirements
  • Complex mechanical systems

Critical plant piping requires more than field capability, it requires disciplined execution from planning to execution.

CRITICAL MECHANICAL SYSTEMS. QUALIFIED EXECUTION.

Plan • Fabricate • Weld • Inspect • Test • Restore

Power Generation Piping Systems

Steam and condensate piping operates under demanding pressure and temperature conditions and requires careful attention to materials, welding procedures, supports, expansion, drainage, and system configuration.

IWS provides installation, modification, repair, and replacement of steam and condensate piping throughout industrial power and utility facilities.

Steam Distribution

  • Steam mains
  • Branch piping
  • Headers
  • Equipment connections

Condensate Return

  • Return piping
  • Condensate mains
  • Equipment connections
  • System modifications

Equipment Piping

  • Boilers
  • Heat exchangers
  • Pumps
  • Process equipment

System Modifications

  • Piping reroutes
  • Capacity changes
  • New connections
  • Aging system replacement

Boilers and their associated piping systems are at the center of many power generation and central utility facilities.

IWS supports boiler-related mechanical work involving piping installation, modifications, equipment connections, and qualified welding.

Boiler Connections

  • Steam piping
  • Feedwater piping
  • Blowdown piping
  • Auxiliary connections

Boiler Headers

  • Distribution piping
  • Equipment connections
  • Valve assemblies
  • System modifications

Auxiliary Piping

  • Feedwater
  • Blowdown
  • Drain piping
  • Project-specific systems

Existing Systems

  • Piping replacement
  • System modifications
  • Equipment upgrades
  • Planned repairs

Reliable fuel delivery is essential to boilers, generators, turbines, and other combustion equipment supporting power generation facilities.

IWS installs, modifies, fabricates, and repairs natural gas and fuel oil piping systems serving critical plant equipment.

Natural Gas

  • Distribution piping
  • Equipment connections
  • Gas headers
  • System modifications

Fuel Oil

  • Supply piping
  • Return piping
  • Distribution headers
  • Equipment connections

Fuel Equipment

  • Pumps
  • Valve assemblies
  • Fuel trains
  • Equipment tie-ins

System Modifications

  • Equipment replacement
  • Capacity upgrades
  • Piping reroutes
  • Existing system tie-ins

Combustion equipment requires properly configured fuel piping, valves, regulators, and associated components to safely and reliably deliver fuel to the equipment.

Gas Trains

  • Isolation valves
  • Regulators
  • Control valves
  • Equipment connections

Fuel Oil Trains

  • Supply and return
  • Pumps
  • Valve assemblies
  • Equipment piping

Equipment Connections

  • Boilers
  • Burners
  • Generators
  • Packaged equipment

Modifications

  • Burner upgrades
  • Boiler replacement
  • Fuel conversions
  • Existing system changes

IWS supports installation, replacement, and mechanical integration of equipment throughout power generation and central utility facilities.

Pumps

  • Feedwater pumps
  • Condensate pumps
  • Circulation pumps
  • Equipment piping

Heat Exchangers

  • Steam connections
  • Hydronic piping
  • Isolation valves
  • Equipment replacement

Boilers & Packaged Equipment

  • Mechanical connections
  • Utility piping
  • Fuel connections
  • Equipment modifications

Mechanical Skids

  • Piping connections
  • Valve assemblies
  • Utility connections
  • Final tie-ins

Power generation facilities contain piping systems where weld integrity directly affects safety, reliability, and plant operation.

IWS supports projects requiring qualified welding procedures, qualified welders, inspection, NDE/NDT, and documented quality.

Qualified Procedures

  • Applicable WPS / PQR
  • Project specifications
  • Code requirements
  • Controlled welding variables

Qualified Welders

  • Pipe welding qualifications
  • Project-specific testing
  • Carbon steel
  • Stainless steel

NDE / NDT

  • Radiographic Testing
  • Ultrasonic Testing
  • Liquid Penetrant Testing
  • Magnetic Particle Testing

Documentation

  • Weld identification
  • Welder records
  • NDE records
  • QA/QC turnover

Power generation facilities often rely on scheduled outages to complete piping replacements, equipment work, valve replacement, inspections, and mechanical modifications that cannot be performed while systems remain in service.

Pre-Outage Planning

  • Site walkdowns
  • Scope verification
  • Field measurements
  • Prefabrication

Outage Execution

  • Piping replacement
  • Valve replacement
  • Equipment modifications
  • Critical tie-ins

Welding & Inspection

  • Qualified welding
  • Visual inspection
  • Required NDE
  • Repair coordination

Return to Service

  • Pressure testing
  • System verification
  • Punch-list completion
  • Startup support

One of the most effective ways to reduce outage duration is to move as much fabrication and preparation as possible outside the outage window.

Field Verification

  • Existing dimensions
  • Tie-in locations
  • Equipment connections
  • Access requirements

Shop Fabrication

  • Pipe spools
  • Valve assemblies
  • Equipment piping
  • Specialty components

Material Preparation

  • Valves
  • Fittings
  • Flanges
  • Consumables

Outage Readiness

  • Installation sequence
  • Crew planning
  • Equipment preparation
  • Final tie-in strategy